MIL-DTL-16034/15A
ITEM
REQUIREMENTS
Sustained overload
1 percent of scale length, max temporary zero shift
0.5 percent of scale length, max permanent zero shift
0.33 percent max permanent change in indication
Vibration
1 percent max change
Friction effect
2 percent max change
Humidity resistance
1 percent max change
NOTES:
1. Percentages are based on full-scale value unless otherwise indicated herein.
2. Referenced specification shall be of the issue in effect on date of invitation for bids.
CHANGES FROM PREVIOUS ISSUE: Marginal notations are not used in this revision to identify changes with
respect to the previous issue due to the extent of the changes.
Custodians:
Preparing Activity:
Army CR
Navy SH
Navy SH
(Project 6625-N094)
Air Force 99
Reviewing Activity:
Navy EC
NOTE: The activities listed above were interested in this document as of the date of this document. Since
organizations and responsibilities can change, you should verify the currency of the information above using the
ASSIST Online database at https://assist.daps.dla.mil.
2