MIL-PRF-49136C(CR)
4.4.3.2 Reinspection of Conforming Group C Sample Units. Unless otherwise specified,
sample units which have been subjected to and passed Group C inspection may be accepted
on the contract provided all damage is repaired and the sample units are re-subjected to and
pass Group A inspection, with the exception of safety engineering.
Table IV. Group C Inspection
Requirement
Test
Inspection
Paragraph
Paragraph
Sub Group 1
3.6.1
4.6.1
Altitude
High Temperature
3.6.2
4.6.2
Low Temperature
3.6.3
4.6.3
Humidity
3.6.4
4.6.4
Rain
3.6.5
4.6.5
Sub Group 2
Immersion
3.6.6
4.6.6
Bench Handling
3.6.13
4.6.13
Vibration
3.6.10
4.6.10
Shock
3.6.12
4.6.12
Sub Group 3 (5)
Electromagnetic Comp.
3.7
4.7
Dust
3.6.7
4.6.7
Salt Fog (4)
3.6.8
4.6.8
Sub Group 4 (5)
Fungus
3.6.9
4.6.9
(4) The equipment shall be thoroughly washed, cleaned, dried and refurbished
after this inspection before proceeding with subsequent inspections.
(5) Shall be performed at first production lot only.
4.5
Methods of Inspection
4.5.1 Personnel Hazards. Verify via visual examination that the CM Test Set is protected
against personnel hazards as described in 3.5.1.
4.5.2 Edge Rounding Exposed. Physically examine the CM Test Sets case and exposed
metal surfaces to determine that all machined surfaces, exposed edges, and metal corners are
rounded to prevent injury to operating personnel. Condition of the edges shall be verified to
conform to the requirement of 3.5.2.
11
For Parts Inquires submit RFQ to Parts Hangar, Inc.
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business