MIL-PRF-49136C(CR)
Table I. First Article Inspection
Order of Tests
Requirement
Test
Unit Unit
Unit
Unit
Inspections
Paragraph
Paragraph
1
2
3
4
1. Bounce
3.5.5
4.5.5
Tests to be performed on all units
Preconditioning (1)
2. Inspections covered by
3.3.1
Visual
Inspections to be performed on all
subsidiary documents
3.3.2
units
3.4
3.
Burn-In
3.5.6
4.5.6
Tests to be performed on all units
4.
Group A Inspection (1)
See Table II
Tests to be performed on all units
5.
Group B Inspection (1)
See Table III
Tests to be performed on all units
6.
Group C Inspection
1
3.6.1
4.6.1
Altitude
2
3.6.2
4.6.2
High Temperature
3
Low Temperature
3.6.3
4.6.3
4
Humidity
3.6.4
4.6.4
5
Rain
3.6.5
4.6.5
1,6
Immersion
3.6.6
4.6.6
2
Dust
3.6.7
4.6.7
3
Salt Fog (2)
3.6.8
4.6.8
1
Fungus (2)
3.6.9
4.6.9
2
Vibration Part I
3.6.10
4.6.10
4.6.11
3
Vibration Part II
3.6.11
4.6.12
4
Shock
3.6.12
4.6.13
5
Bench Handling
3.6.13
7. EMI
3.7
4.7
1
NOTES:
(1) Inspections 1 to 5, in the order shown, shall be performed on all first article units
before subjecting units to any other inspection requirements.
(2) The equipment shall be thoroughly washed, cleaned, dried and refurbished after this
inspection before proceeding with subsequent inspections.
4.4 Conformance Inspection. The contractor shall perform the inspections specified in 4.3
and 4.4.1 through 4.4.3. This does not relieve the contractor of the responsibility for
performing any additional inspection which is necessary to control the quality of the product
and to ensure compliance with all specification requirements.